Why Nuclear Power Plant O&M cannot be run on spreadsheets

Nuclear O&M is defined by evidence: every safety system test, every radiation reading, every sign-off must be retrievable on demand for an AERB review. Plan-Sarthi structures the plant from reactor systems down to individual valves and instruments, drives safety inspections from frequency-based schedules, and records the technician, the checklist result and the manager verification against each one. Refuelling and outage campaigns are planned in the same register the daily logs live in.

Nuclear Power Plant equipment

Equipment and Systems We Monitor

Reactor Core & Pressure Vessel

Inspection campaigns and integrity records

Steam Generators

Tube inspection, chemistry and leak testing

Primary Coolant Pumps

Seal, vibration and flow monitoring

Turbine-Generator Set

Overhaul history and protection testing

Emergency Core Cooling (ECCS)

Availability testing and functional checks

Radiation Monitoring System

Dose readings logged and trended by area

Spent Fuel Pool

Level, temperature and chemistry parameters

Control Rods

Drop time testing and drive mechanism PM

Instrumentation & Control

Calibration due dates and loop checks

Safety Relief Valves

Set pressure testing and certification

Emergency DG Sets

Load testing, fuel and start reliability

Waste Management System

Handling, storage and disposal records

How Plan-Sarthi Powers Nuclear Power Plant O&M

Safety System Inspection Scheduling

Statutory and safety-class inspections raise work orders with mandatory digital sign-off.

Radiation Monitoring Log

Area dose readings captured per shift and graded against permissible limits.

Outage Planning & Refuelling

Campaign tasks, resources and completion evidence tracked in one place.

Live O&M Dashboard — Nuclear Power Plant

Capacity factor
88.6%
Safety system availability
99.7%
UCLF
1.2%
Collective dose
0.42 mSv
Capacity factor % — last 6 months
AprMayJunJulAugSep0255075100
Asset status
  • ECCS Train AOperational96
  • Primary Pump P-2Operational91
  • RMS Channel 7Under Maintenance68
  • EDG-2Operational87
Capacity Factor %
Generation performance
Safety System Availability %
Availability
UCLF %
Unplanned capability loss
Dose (mSv)
Radiation exposure

Regulatory and Safety Compliance

  • AERB Safety Codes
  • IAEA Safety Standards
  • Atomic Energy Act 1962
  • IS 13947
  • INSAG Guidelines
  • NEI Standards

What Our Clients Say

The structured inspection scheduling and digital sign-off has significantly improved our AERB audit readiness.
— Safety and O&M Head, Nuclear Power Station, Maharashtra

Get a Free Nuclear Power Plant O&M Walkthrough

See exactly how Plan-Sarthi manages O&M for Nuclear Power Plant projects — a 20-minute personalised walkthrough, no commitment required.

We respect your privacy. Your details are only used to schedule your walkthrough and will never be shared.

Ready to Modernise Your Nuclear Power Plant O&M?

Join leading EPC and O&M companies using Plan-Sarthi to cut downtime, stay compliant, and manage assets smarter.