Plan-Sarthi uses essential cookies to keep you signed in and to remember your workspace preferences, plus optional analytics cookies that help us improve the platform. You can reject the optional ones and still use everything. Read our Cookie Policy
Audit-ready safety records, every inspection signed and time-stamped.
Nuclear O&M is defined by evidence: every safety system test, every radiation reading, every sign-off must be retrievable on demand for an AERB review. Plan-Sarthi structures the plant from reactor systems down to individual valves and instruments, drives safety inspections from frequency-based schedules, and records the technician, the checklist result and the manager verification against each one. Refuelling and outage campaigns are planned in the same register the daily logs live in.
Inspection campaigns and integrity records
Tube inspection, chemistry and leak testing
Seal, vibration and flow monitoring
Overhaul history and protection testing
Availability testing and functional checks
Dose readings logged and trended by area
Level, temperature and chemistry parameters
Drop time testing and drive mechanism PM
Calibration due dates and loop checks
Set pressure testing and certification
Load testing, fuel and start reliability
Handling, storage and disposal records
Statutory and safety-class inspections raise work orders with mandatory digital sign-off.
Area dose readings captured per shift and graded against permissible limits.
Campaign tasks, resources and completion evidence tracked in one place.
The structured inspection scheduling and digital sign-off has significantly improved our AERB audit readiness.
See exactly how Plan-Sarthi manages O&M for Nuclear Power Plant projects — a 20-minute personalised walkthrough, no commitment required.
Join leading EPC and O&M companies using Plan-Sarthi to cut downtime, stay compliant, and manage assets smarter.