Thermal Power Plant project site
Industry

Thermal Power Plant

From boiler erection to synchronisation — keep your thermal project on schedule and on budget.

A thermal package is thousands of tonnes of steel erected in a fixed sequence across three shifts. Plan-Sarthi measures MT erected per shift and converts it into a synchronisation date you can commit to.

The challenges

01

Boiler and turbine erection sequencing

Pressure parts, structures and TG deck follow a strict order where one late consignment cascades for months.

02

Coal handling and BOP coordination

CHP, ash handling, water systems and switchyard run as near-independent packages that must converge.

03

Grid synchronisation delays

Charging, trial run and COD depend on agencies outside your control but inside your liquidated damages.

04

O&M handover documentation

Punch lists, test reports and as-built records demanded in full at the worst possible moment.

How Plan-Sarthi solves it

Phase-wise WBS for thermal activities

Foundations, structures, boiler pressure parts, TG, piping, CHP and switchyard as real quantities — MT erected, Cu.M poured, Dia-Inch welded.

BOQ for structural and mechanical packages

Bulk steel, piping and equipment schedules imported and tracked against erected quantity, not invoice quantity.

Risk Radar for critical equipment delays

Forecast finish per package with value at risk, flagging the equipment that will move COD.

Shift-wise DPR tracking

Three shifts a day captured separately with manpower split and idle hours, so productivity per shift is visible.

Synchronisation forecast

Trailing erection rates project the charging and trial-run dates with a stated confidence level.

Punch list and handover register

Snags and test reports tracked to closure per system, so O&M handover is assembled progressively.

MT per shift

erection productivity, measured across all three shifts

Package-wise

forecast of the date that actually drives COD

Idle hours

priced automatically as cost leakage

Indicative of what the platform makes measurable on a typical package; actual results depend on your project and data discipline.

Where Plan-Sarthi sits in the lifecycle

STAGE 1
Pre-construction
STAGE 2
Mobilisation & foundations
STAGE 3
Erection
STAGE 4
Testing, charging & trial run
STAGE 5
COD & O&M handover

"Boiler erection tonnage per shift is now a number we manage, not a number we discover at month end."

Site Project Manager · Thermal Package
2 × 660 MW project

Managing a Thermal Power Plant project? Start your free 14-day trial.

No card, no obligation. Bring one live work front and see the S-curve, critical path and earned value build themselves from your daily reports.