Wind EPC project site
Industry

Wind EPC

Track turbine erection, blade logistics, and power evacuation — all on one dashboard.

Wind sites are remote, weather-bound and crane-constrained. One blade stuck at a ghat section can idle a ₹2-crore crane for a week. Plan-Sarthi keeps that sequence visible from the head office.

The challenges

01

Blade and nacelle transport delays

Over-dimensional consignments, ghat sections and police permissions decide your erection window, not your plan.

02

Foundation pour sequencing

Curing periods and crane pad readiness must line up with the crane's arrival or the whole cycle slips.

03

Substation and evacuation coordination

Pooling station, line stringing and charging run on a different agency's calendar.

04

Remote site reporting

Sites with no connectivity report by phone call, so the head office is always working on yesterday's picture.

How Plan-Sarthi solves it

Milestone tracker for erection phases

Foundation, tower sections, nacelle, hub and blades tracked WTG by WTG with dates and float, so the crane path is planned, not improvised.

Field reporting from remote sites

DPRs logged offline on the device and synced the moment a bar of signal returns — nothing is lost on a hilltop.

Predictive commissioning forecast

Erection cycle time per WTG turns into a forecast charging date you can defend with the offtaker.

Multi-site dashboard

Every wind site in one portfolio view — MW erected, MW charged, and which site is dragging the programme.

Logistics and consignment hindrances

Transport delays logged as priced hindrances against the affected WTG, ready for an extension-of-time claim.

Weather and crane-idling exposure

Idle crane hours costed automatically so the commercial impact of a weather window is visible immediately.

Per-WTG

erection cycle time, measured instead of estimated

Zero data loss

on sites with no mobile coverage

One view

across every wind site in the portfolio

Indicative of what the platform makes measurable on a typical package; actual results depend on your project and data discipline.

Where Plan-Sarthi sits in the lifecycle

STAGE 1
Pre-construction
STAGE 2
Mobilisation
STAGE 3
Execution
STAGE 4
Testing & commissioning
STAGE 5
Handover

"The crane schedule finally matches the foundation reality. That alone paid for the platform."

Construction Manager · Wind Projects
Multi-site 100 MW+ programme

Managing a Wind EPC project? Start your free 14-day trial.

No card, no obligation. Bring one live work front and see the S-curve, critical path and earned value build themselves from your daily reports.