Nuclear Projects project site
Industry

Nuclear Projects

Audit-ready project controls for India's most complex energy projects.

Audit Trail Enabled — Every Edit Logged with Timestamp and User

On a nuclear package the question is never only "what is the progress" — it is "who recorded it, when, against which hold point, and can you prove it". Plan-Sarthi is built so that answer is always one click away.

The challenges

01

Extreme regulatory compliance

AERB and client QA expect traceability on every quantity, every sign-off and every revision.

02

Multi-agency coordination

Owner, consultant, QA, contractor and vendors all touching the same hold points.

03

Long project lifecycles

Teams rotate over eight to ten years; institutional memory must live in the system, not in people.

04

Quality hold points

Work cannot proceed past a stage without inspection and recorded clearance.

How Plan-Sarthi solves it

Full audit trail on every edit

Timestamp, user, field, old value, new value and a mandatory reason. The log is append-only — even a correction is itself recorded.

Role-based access with permission logs

Six roles enforced at the database layer, with a 24-hour supervised revert window on administrative corrections.

Milestone sign-off workflows

DPR entries stay unvalidated until an authorised person clears them, so no figure counts until it is signed.

Document version control

Drawings, ITPs, WPS and clearance certificates versioned against the activity and the hold point they govern.

Hold-point aware critical path

Inspection stages modelled as activities with float, so a pending clearance shows its true schedule cost.

Defensible delay records

Every hindrance attributed and priced at the time it occurred, not reconstructed a year later.

100%

of administrative edits logged with user, time and reason

Append-only

audit log with no delete path, by design

8–10 year

traceability that survives team rotation

Indicative of what the platform makes measurable on a typical package; actual results depend on your project and data discipline.

Where Plan-Sarthi sits in the lifecycle

STAGE 1
Pre-construction & licensing
STAGE 2
Mobilisation
STAGE 3
Execution with hold points
STAGE 4
Testing & commissioning
STAGE 5
Handover & O&M

"When QA asks who changed a quantity and why, we answer in seconds. That is the difference between an audit and an argument."

QA & Planning Head · Nuclear Construction Package
Containment structure works

Managing a Nuclear Projects project? Start your free 14-day trial.

No card, no obligation. Bring one live work front and see the S-curve, critical path and earned value build themselves from your daily reports.