Hydropower Plant

Hydropower Plant

Machine health and dam safety records, ready for a CWC audit.

HomeO&MHydropower Plant

Why Hydropower Plant O&M cannot be run on spreadsheets

Hydro assets are unusually long-lived and unusually consequential — the same plant contains a 40-year-old Francis runner and a dam whose safety records are statutory. Plan-Sarthi keeps electro-mechanical PM and civil structure inspection in one register, so gate actuator servicing and spillway inspection sit beside generator overhauls. Generation is correlated against logged inflow and reservoir level, which makes efficiency loss and silt damage visible early.

Hydropower Plant equipment

Equipment and Systems We Monitor

Francis / Kaplan / Pelton Turbines

Runner, guide vane and cavitation inspection

Generator & Exciter

IR values, bearing and winding condition

Governor System

Response testing and oil condition

Transformer & Switchyard

Statutory testing and protection checks

Dam & Civil Structures

Seepage, settlement and crack inspection

Spillway Gates & Actuators

Operation testing and hoist maintenance

Penstock

Thickness survey, coating and expansion joints

Tailrace

Silting, erosion and clearing records

Sluice Gates

Seal condition and operating trials

Drainage & Dewatering Pumps

Availability and performance testing

SCADA & Protection System

Relay testing and communication uptime

Firefighting System

Statutory checks and pressure testing

How Plan-Sarthi Powers Hydropower Plant O&M

Civil Structure Inspection Scheduling

Dam, penstock and spillway inspections driven by statutory frequency with evidence attached.

Gate & Actuator PM Tracking

Operating trials and hoist servicing tracked per gate with checklist results.

Generation vs Water Inflow

Reservoir level and inflow readings compared against output to expose efficiency loss.

Live O&M Dashboard — Hydropower Plant

Availability
94.2%
Machine efficiency
89.6%
Silt concentration
1,240 ppm
Generation (MTD)
38.4 MU
Availability % — last 6 months
AprMayJunJulAugSep0255075100
Asset status
  • Unit-2 Francis TurbineOperational88
  • Spillway Gate 3Under Maintenance64
  • Penstock Section BOperational82
  • Dewatering Pump P-1Faulty41
Availability %
Plant availability
Efficiency %
Machine efficiency
Silt Level
Silt concentration
Level vs MU
Reservoir vs generation

Regulatory and Safety Compliance

  • CWC Dam Safety Guidelines
  • IS 4410
  • CEA Hydro Regulations
  • NDSA Dam Safety Act 2021
  • IEC 60041
  • State Irrigation Norms

What Our Clients Say

Dam safety inspection records are now digital and accessible instantly during CWC audits.
— Plant Manager, 120MW Hydropower Project, Himachal Pradesh

Get a Free Hydropower Plant O&M Walkthrough

See exactly how Plan-Sarthi manages O&M for Hydropower Plant projects — a 20-minute personalised walkthrough, no commitment required.

We respect your privacy. Your details are only used to schedule your walkthrough and will never be shared.

Ready to Modernise Your Hydropower Plant O&M?

Join leading EPC and O&M companies using Plan-Sarthi to cut downtime, stay compliant, and manage assets smarter.