Plan-Sarthi uses essential cookies to keep you signed in and to remember your workspace preferences, plus optional analytics cookies that help us improve the platform. You can reject the optional ones and still use everything. Read our Cookie Policy

Solar EPC project site
Industry

Solar EPC

From land survey to grid synchronisation — manage every phase of your solar project in one platform.

Utility-scale solar lives and dies by throughput: modules mounted per day, strings terminated, trenches dug. Plan-Sarthi measures that throughput against your PPA date and tells you, weeks in advance, whether you will make it.

The challenges

01

Land acquisition and survey delays

Right-of-way disputes and pending revenue records stall mobilisation while the PPA clock keeps running.

02

Module and inverter procurement tracking

Container-wise arrivals, DC capacity received versus installed, and BOS shortages that surface only at the array.

03

Grid connectivity timelines

Bay extension, CTU/STU approvals and evacuation readiness sit outside your control but inside your schedule.

04

Commissioning snags and punch lists

Thousands of small defects across blocks with no single register, so PAC slips by weeks.

How Plan-Sarthi solves it

WBS built for solar phases

Survey, piling, MMS, module mounting, DC/AC cabling, ICR, ITP and grid tie-in as real quantities — piles driven, modules mounted, RMT of cable pulled — not vague percentages.

BOQ parser for panel and inverter quantities

Drop in the vendor BOQ or estimate; modules, structures, inverters and cable schedules become live scope with units normalised to Nos, MT and RMT.

Risk Radar for weather and grid risk

Trailing run-rates against the balance scope forecast each block's finish date and flag which array is going to miss synchronisation.

DPR with site photo evidence

Block-wise daily progress from a phone — even with no signal — with manpower split, idle hours and weather logged against the same activity.

Block-wise commissioning register

String testing, IV curves and snag closure tracked per block so PAC documentation assembles itself.

Multi-block S-curve

Planned versus actual MW installed, with earned value on real executed DC capacity.

Up to 30%

faster snag closure with a single block-wise punch register

Daily

MW-installed visibility instead of a Monday spreadsheet

Weeks earlier

warning on blocks that will miss grid synchronisation

Indicative of what the platform makes measurable on a typical package; actual results depend on your project and data discipline.

Where Plan-Sarthi sits in the lifecycle

STAGE 1
Pre-construction
STAGE 2
Mobilisation
STAGE 3
Execution
STAGE 4
Testing & commissioning
STAGE 5
Handover

"We used to discover a slipping block at the monthly review. Now the trend shows up while there is still time to add crews."

Project Head · Solar EPC Division
150 MW utility-scale project

Managing a Solar EPC project? Start your free 14-day trial.

No card, no obligation. Bring one live work front and see the S-curve, critical path and earned value build themselves from your daily reports.

Explore other industries